What to Mark on a Drain Pan Quote Request

A drain pan usually shows up on a request as a line in an equipment schedule or a small rectangle under a unit on the plan. That is enough to know a pan is needed. It is not enough to build one. The shop still needs the size of the pan, how deep it is, where every drain goes, what connects to each drain, and how the pan is supported. When those notes are missing, the request comes back with questions before it can be priced.

This article covers what to mark on a drain pan request before you send it: the length, width, and depth, which side of the pan each number measures, drain locations from a named pan edge, drain sizes and connection types, any slope or special finish, the material and gauge from your project drawings, and the mounting details.

For the full quote checklist (drawings, materials, connections, releases, pickup or delivery), see the Contractor Guide. For drain pans as a product, see Drain pans. This post stays on the request notes.

DuctAxis is a commercial duct fabricator in Clewiston, Florida. We fabricate custom sheet-metal drain pans to the dimensions and requirements you send. We fabricate; you install. Your installation scope and customer relationships remain yours.

Why drain pan requests get sent back

Most of what a drain pan needs is already in the drawing set somewhere. The problem is that it is spread out. The overall size may be on the plan, the depth in a detail, the drain size in a plumbing sheet, and the material in a general note on another page.

Common gaps on drain pan requests:

  • A length and width with no depth
  • No note on whether the size is inside or outside of the pan
  • Drains shown on the plan but not dimensioned
  • Drain locations with no reference edge, so the numbers can be read more than one way
  • No drain size or connection type
  • Slope implied by a note but not shown
  • No material or gauge listed
  • No mounting or support details

A request with the notes below is enough to start estimating.

List length, width, and depth

Start with the pan itself. Give all three dimensions for every pan on the job.

  • Write all three numbers. A plan view shows length and width. The depth is usually in a section, a detail, or the equipment schedule. If you only send two numbers, the request is not complete.
  • Name the sides. Pick a way to label the sides (for example, front, back, left, right, as seen from the service side of the unit) and use the same labels every time on the request.
  • One pan per line. If the job has more than one drain pan, list each by mark, tag, or the equipment it serves, in the same order the drawings use.

If the documents do not give a dimension, leave it open and flag it. Do not guess a number to make the request look complete.

Inside or outside dimension

The same pan can be described by its inside size or its outside size. Both are common, and the request should say which one each number means.

For every dimension you send, say which it is:

  • Length and width: inside of the pan walls, or outside of the finished pan
  • Depth: inside depth from the pan bottom to the top of the wall, or overall height
  • Equipment fit: if the pan has to fit around or under a specific unit, give the unit tag so the size can be checked against the schedule

If the drawings say "inside" or "outside" next to a number, copy that word onto the request. If they do not say, flag it so it can be confirmed during estimating.

Locate every drain from a fixed pan edge

Drain locations are where most drain pan questions come from. A drain that is a few inches off can mean the pan does not line up with the piping that is already planned.

  1. Pick one fixed edge or corner of the pan, name it on the request, and measure every drain from it.
  2. Give the offset from that edge to the drain in both directions.
  3. Say whether you are measuring to the center of the drain or to its edge.
  4. Note whether each drain is in the bottom of the pan or in a side wall, and which side, using the same side labels as above.
  5. If the pan has more than one drain, dimension each one from the same reference rather than from each other.

A simple marked-up sketch works well here. Draw the pan in plan view, mark the reference corner, and write the offsets on it. If a drain is in a side wall, add a side view with the height of the drain from the pan bottom. Save the sketch as a PDF with the rest of the drawings.

Drain size and connection type

Each drain connects to something. The shop needs to know what kind of connection each drain gets and how big it is.

For each drain, note:

  • Drain size, as the drawings or plumbing documents give it
  • Connection type, as the drawings or specifications describe it
  • Primary or secondary, if the documents call out more than one drain for a pan and give them different roles
  • What it serves, such as the equipment tag, so the drain can be checked against the rest of the set

If the drain size or connection type is not shown, write "drain size not specified, to be confirmed" or "connection not specified, to be confirmed" so the question gets answered before the order is released, not after.

Slope, seams, and finish

Some pans are built flat. Some need a slope toward the drain. Some specifications call for a particular seam treatment or finish. None of this should be assumed.

  • Slope. If the drawings or specifications call for slope, show it on the sketch and copy the requirement as written, including which way it falls and toward which drain.
  • Seams. If the documents call for a specific seam or joint treatment, note it exactly as written.
  • Finish. If a special finish or coating is required, say so explicitly and copy the wording from the specification.

If a general note mentions slope or finish but the pan detail does not show it, flag the conflict on the request rather than picking one.

Material and gauge from the project drawings

Write the material and gauge the project drawings or specifications call for. Use the same wording the documents use.

  • If different pans on the job use different materials or gauges, list which is which.
  • If the pan sits in a location the specifications treat differently from the rest of the job, note which section of the specification applies.
  • If no material or gauge is given, write "material and gauge not specified, to be confirmed" so the question goes to the engineer of record before the order is released.

Mounting and support details

The pan has to sit on something or hang from something. The shop needs to know how, because it can change what gets built.

  • How it is supported. Note whether the pan sits on a platform, a stand, the floor, or is hung, as the drawings show it.
  • What sits in it. Give the equipment tag for the unit the pan serves, so the pan can be checked against the unit size in the schedule.
  • Mounting features. If the drawings show tabs, flanges, holes, or other mounting features on the pan, call each one out with its location from the same reference edge.

If mounting details are not shown, write "mounting not specified, to be confirmed" on the request.

Quick checklist before you send the request

  • Each drain pan listed by mark, tag, or equipment served
  • Length, width, and depth for each pan
  • Each dimension marked as inside or outside
  • Side labels used the same way throughout
  • One fixed reference edge or corner named for each pan
  • Every drain located from the reference edge, center or edge noted
  • Each drain marked as bottom or side wall
  • Drain size and connection type for each drain, or flagged as not specified
  • Slope, seams, and finish per documents, or flagged
  • Material and gauge per documents, or flagged as not specified
  • Mounting and support details, or flagged as not specified
  • Drawings, details, and sketches saved as legible PDFs

If a box is empty, either fill it in or flag it in the request ("drain location to be confirmed before release"). That is faster than a request that looks complete and is not.

How this fits the drain pans page

The Drain pans page is where drain pan work lives: custom sheet-metal drain pans fabricated to project dimensions. That page lists what to send for a quote: length, width and depth, material and gauge, drain locations and sizes, and mounting details. This article does not replace it; it only explains how to mark those items on the request so it arrives with what the shop needs.

When you are ready to price the package, use the Contractor Guide for project details, drawings, construction requirements, dates, and pickup or delivery notes.

Send your drain pan request

When the notes are ready, save the drawings, details, and marked-up sketches as legible PDFs and request a quote. Uploads accept PDF, XLSX, XLS, CSV or ZIP files: up to 8 files, 20 MB each, 50 MB total. For a larger package, call (863) 599-7014 or email office@ductaxis.com.

  • Quote response time: under 48 hours, excluding weekends. That is how long it takes to get a quote back, not the fabrication lead time.
  • Shipping: Free shipping anywhere in Florida. Delivery outside Florida, including LTL freight, is confirmed with your quote.
  • Shop: DuctAxis, 535 E El Paso Avenue, Suite C, Clewiston, FL 33440

Free estimates from your mechanical plans (PDF). Send what you have; a named reference edge and clear drain notes still make the first pass cleaner.

Final dimensions, materials, and fabrication follow your approved project requirements and are confirmed during estimating. This article is general guidance for writing drain pan requests and does not replace your project specifications, drawings, or engineer of record.