What to Send When the Spec Says Double-Wall

When a duct line says "double-wall" and nothing else, the shop still has to ask what the inner and outer walls are, what sits between them, and whether the size on the plan is the clear inside or the outside of the assembly. That slows the quote. This article covers the wall and insulation notes a double-wall request usually needs before it can be priced and fabricated - so you can mark them once and send a cleaner package.

For the full quote checklist (drawings, materials, connections, releases, pickup or delivery), see the Contractor Guide. For double-wall fabrication itself - what the shop builds and how to request an estimate - see Double-Wall Duct. This post stays on the construction notes only.

DuctAxis is a commercial duct fabricator in Clewiston, Florida. We fabricate. We do not install.

Why "double-wall" by itself is not enough

Double-wall means an inner wall, an outer wall, and insulation between them. Each choice changes material, labor, and the outside size of the piece. If any of that is missing, or nobody says whether the dimension is clear inside or sheet metal outside, the ticket cannot be built without guessing or calling you back.

Common gaps:

  • "Double-wall" or "DW" on the line with no inner material, outer material, or insulation from the spec
  • No note on whether the inner wall is solid or perforated
  • A duct size with no note on whether it is the inside (clear) dimension or the outside of the finished assembly
  • Insulation type or thickness left off, or a drawing note that does not match the spec section
  • Fittings on a double-wall run with no note on whether they are double-wall too
  • Mixed lined and double-wall work listed as one construction type

You do not have to rewrite the spec. A clear schedule line plus the double-wall spec section is enough to start estimating. Free estimates from your mechanical plans are available when the set is thin; clearer notes still cut questions.

Start with the spec section

  1. Attach or reference the double-wall or insulated duct spec section by number and page.
  2. Note any addenda or approved submittals that change the construction.
  3. Flag conflicts between the drawings and the spec instead of picking one. If the plan note and the spec disagree on walls, insulation, or perforation, say so in the request.

Final dimensions, materials, and fabrication follow your approved project requirements and are confirmed during estimating. Do not guess a wall material, insulation, or thickness - send what the documents state, or flag that it is missing.

Inner wall, outer wall, and insulation

Inner wall

  • The inner material as the documents state it, without inventing a grade or gauge the drawings do not show
  • Whether the inner wall is solid or perforated. If the documents call for a perforated inner wall, say so plainly. Perforated double-wall is a different construction path; see Perforated Double-Wall Duct when that is what the spec requires, and keep it labeled as perforated so it is not priced as a solid inner wall.

Outer wall

  • The outer material as the documents state it
  • Any finish or exposure note the documents apply to the outer shell

Insulation between the walls

  • The insulation type or description exactly as the spec or approved submittal states it
  • The insulation thickness from the documents
  • Separate lines when different systems use different insulation

If the drawings show a double-wall run but no insulation thickness, flag it ("insulation thickness not shown on M-201 or in spec, need confirmation").

Inside or outside: say which dimension you mean

The inner wall, insulation, and outer wall all take up space. A 24 x 12 duct can mean a 24 x 12 clear opening with the assembly built larger, or a 24 x 12 outside size with a smaller clear opening once the walls and insulation are in.

On every double-wall line, or once at the top of the schedule:

  • State whether sizes are inside (clear) dimensions or outside dimensions of the finished assembly
  • Use the same convention the drawings use, and say what it is
  • If the drawings do not say, flag it rather than assuming either way

Where a double-wall run meets equipment, a single-wall run, or a fitting from another package, the size that has to match may be the outside metal, not the clear opening. Note which side has to fit.

Where double-wall starts and stops

  • List double-wall runs by mark or segment, rather than one total footage
  • Write start and stop points shown on the plan onto the request
  • When double-wall and single-wall (or lined) duct share a run, put them on separate lines
  • Keep perforated-inner and solid-inner on separate lines when both appear

Lined duct and double-wall duct are different constructions. If the documents call for liner, see Liner Notes to Put on a Lined-Duct Quote. If they call for inner and outer walls, treat it as double-wall. Do not list "lined / double-wall" as one vague line.

Fittings on a double-wall run

Elbows, offsets, transitions, and takeoffs on a double-wall run need the same wall and insulation notes as the straights.

  • Note whether each fitting on the run is double-wall
  • Use the same inner, outer, insulation, and inside or outside convention as the straight duct it connects to
  • Give both end sizes on transitions and reducers, with the inside or outside note on both ends
  • Call out turning vanes, access openings, or other items when the documents require them
  • Say when a fitting is solid-inner and when it is perforated-inner, if both appear

If one fitting is double-wall and the next is not, mark both so the change is not missed.

Connections and other notes from the spec

When the documents include them, put these on the request or point to the paragraph:

  • Connection type at each end if it differs from the run or is called out at equipment
  • Any requirement for how the inner and outer walls are closed at ends and openings
  • Pressure or application notes the documents tie to double-wall construction, quoted as written
  • Any test, rating, or listing the spec requires, quoted as written

Only send what the documents state. Do not invent a gauge, standard, or certification to complete a blank line.

Quick checklist before you send the double-wall package

If a box is empty, either fill it from the documents or flag it in the request ("inner wall material not stated for supply mains, need confirmation"). That is faster than an incomplete line that looks complete.

How this fits the double-wall package

The double-wall duct page is where fabrication scope for inner-and-outer-wall work lives. This article does not replace that page; it only helps the construction notes arrive complete. If the inner wall must be perforated, use the perforated double-wall page for that scope and keep the perforation note on the request.

When you are ready to price the package, use the Contractor Guide for project details, drawings, construction requirements, dates, and pickup or delivery notes. Free shipping applies anywhere in Florida. Delivery details for other states in the service area are confirmed with your project quote - do not assume free shipping outside Florida.

Send the notes with your request

When the wall and insulation notes are marked, request a quote. Uploads accept PDF, XLSX, XLS, CSV or ZIP files: up to 8 files, 20 MB each, 50 MB total. For a larger package, call (863) 599-7014 or email office@ductaxis.com.

  • Quote response time: under 48 hours, excluding weekends. That is how long it takes to get a quote back, not the fabrication lead time.
  • Shipping: Free shipping anywhere in Florida. Delivery outside Florida is confirmed with your quote.
  • Shop: 535 E El Paso Avenue, Suite C, Clewiston, FL 33440

Free estimates from your mechanical plans are available. Send what you have; clearer inner, outer, insulation, and dimension notes still make the first pass cleaner.

Dimensions, material grades, and ratings are confirmed during estimating. This article is general guidance for double-wall quote notes and does not replace your project specifications, drawings, or engineer of record.