What a Curb Request Needs From the Cut Sheet

A curb looks like a simple box on the roof plan, and a lot of curb requests are written that way: a mark, a unit tag, and maybe an outside dimension. But a curb has to fit a specific piece of equipment, sit on a specific roof, and meet structural requirements that someone else has already set. When those details stay on the equipment submittal or in the structural set, the shop has to stop and ask before it can price the curb.

This article covers what to pull from the equipment cut sheet and the rest of the documents before you send a curb request: the equipment information, the curb size and height, the material, the roof interface, the openings, and the structural requirements.

For the full quote checklist (drawings, materials, connections, releases, pickup or delivery), see the Contractor Guide. For curbs as a product, see Curbs. This post stays on the request notes.

DuctAxis is a commercial duct fabricator in Clewiston, Florida. We fabricate curbs to the dimensions and approved details you send. We do not install, and we do not engineer the curb. Structural or engineering requirements must be provided with the scope.

Why curb requests get sent back

Most of what a curb needs is already on paper somewhere. The problem is that it is spread across three or four documents that do not always travel together: the equipment manufacturer's cut sheet, the mechanical roof plan, the architectural roof details, and the structural drawings.

Common gaps on curb requests:

  • A unit tag with no cut sheet attached
  • An outside size with no note on whether it is the curb or the unit footprint
  • No curb height, or a height with no reference point
  • No material or gauge called out
  • No note on roof slope, roof type, or how the curb meets the deck
  • Duct openings in the curb shown on the plan but not dimensioned
  • Structural requirements mentioned in a note but not included

A request with the notes below is enough to start estimating.

Start with the equipment cut sheet

Send the manufacturer's cut sheet or submittal for each piece of equipment that sits on a curb. It is usually the best single source for what the curb has to match. Use the approved submittal if there is one, not the basis-of-design sheet from the spec, since the selected unit can differ from the one the engineer drew.

From the cut sheet, the useful items are:

  1. Manufacturer and model, exactly as listed, including any suffix
  2. Unit footprint and base dimensions, as the manufacturer shows them
  3. Curb or base requirements, if the manufacturer lists any
  4. Supply and return opening sizes and locations, for units that discharge down through the curb
  5. Unit weight, if the structural design needs it and it is not already covered elsewhere

If the cut sheet shows a manufacturer's own curb drawing, send that page. If you are asking for a curb built to match a manufacturer's curb, say so plainly in the request.

List the curb size and height

Write the curb dimensions the documents call for, and say what each number measures.

  • Outside or inside. Note whether the length and width are outside dimensions, inside dimensions, or the dimensions of the unit rail the curb has to support. These are not the same number.
  • Height. Give the curb height and what it is measured from: the roof deck, the top of insulation, or the finished roof surface. A height with no reference point is the most common reason a curb question comes back.
  • Sloped roofs. If the roof slopes and the top of the curb must be level, say so, and give the slope and its direction. Note which side is the low side.
  • More than one curb. List each curb by mark or unit tag, in the same order the rest of the set uses.

If the documents do not give a height or size, leave it open and flag it. Do not guess a number to make the request look complete.

Name the material and gauge

Write the material and gauge (or decimal thickness) the documents call for. If the spec section, the curb detail, or the manufacturer's curb requirements give one, use that wording.

  • If different curbs on the job use different materials, list which is which.
  • If the documents call for insulation, a wood nailer, or other parts on the curb, note them exactly as written.
  • If no material or gauge is given, write "material not specified, to be confirmed" so the question goes to the engineer of record before the order is released, not after.

Describe the roof interface

The curb has to meet the roof, and the roof details decide how. Send what the architectural or roofing details show:

  • Roof type and deck, as the documents describe them
  • Insulation thickness at the curb location, if the height is measured from the deck
  • Flashing or base details that the curb has to work with
  • Mounting or attachment notes shown on the details

The roofing contractor and the installer handle the roof work itself. The shop only needs these details so the curb is built to fit them. Do not invent a flashing method or attachment detail on the request. If the documents do not say, flag it and it can be confirmed during estimating.

Mark openings through the curb

For units that supply or return air down through the roof, the curb often needs openings or a divider inside it.

  1. Give each opening size as width x height, and which side of the curb it is on.
  2. Note the location of each opening, measured from a curb edge you name.
  3. Say whether the duct below connects at the curb, and if so, what the documents show for that connection.
  4. If the curb needs an internal divider between supply and return, note it and where it sits.

If the opening sizes come from the cut sheet, say so and attach that page. If they come from the duct drawings, give the sheet number.

Include the structural requirements

This is the part the shop cannot fill in. DuctAxis builds the curb to your approved details. The engineer of record, the structural design, or the equipment manufacturer sets the structural requirements, and those have to be provided with the scope.

Send whatever applies to the job:

  • Structural drawings or details that show the curb, its supports, or the framing below it
  • Wind or seismic requirements for rooftop equipment, if the documents include them
  • Attachment requirements between the curb and the structure, and between the unit and the curb
  • Approved shop drawings, if the curb has already been through submittal

If a structural note says "curb by others to be designed," the design is not something the shop can supply. Flag that line in the request so it gets resolved before pricing.

Quick checklist before you send the request

If a box is empty, either fill it in or flag it in the request ("curb height to be confirmed by engineer before release"). That is faster than a request that looks complete and is not.

How this fits the curbs page

The Curbs page is where curb work lives: custom fabricated curbs made to the dimensions and details of your project. That page lists what to send for a quote: equipment and approved details, dimensions and height, material and gauge, and roof interface requirements. This article does not replace it; it only explains how to pull those notes from the cut sheet and the rest of the set so the request arrives with what the shop needs.

When you are ready to price the package, use the Contractor Guide for project details, drawings, construction requirements, dates, and pickup or delivery notes.

Send your curb request

When the notes are ready, save the cut sheets, drawings, and details as legible PDFs and request a quote. Uploads accept PDF, XLSX, XLS, CSV or ZIP files: up to 8 files, 20 MB each, 50 MB total. For a larger package, call (863) 599-7014 or email office@ductaxis.com.

  • Quote response time: under 48 hours, excluding weekends. That is how long it takes to get a quote back, not the fabrication lead time.
  • Shipping: Free shipping anywhere in Florida. Delivery outside Florida is confirmed with your quote.
  • Shop: 535 E El Paso Avenue, Suite C, Clewiston, FL 33440

Free estimates from your mechanical plans (PDF). Send what you have; a clear cut sheet and a curb height with a reference point still make the first pass cleaner.

Final dimensions, materials, and fabrication follow your approved project requirements and are confirmed during estimating. DuctAxis does not provide structural engineering for curbs. This article is general guidance for writing curb requests and does not replace your project specifications, drawings, or engineer of record.